Skip to content
  • Front Page
  • Research
    • Roadmap Database
    • TRB Committee (AKT20)
  • Library
    • TSP2 Video Library
    • News Archive
  • Technical
    • Task Force Products
    • Treatment Quantity & Cost Database
    • Web-Based Training
    • Pavement Preservation Checklist Series 2019
    • Asphalt
    • Concrete
    • Policy
    • Publications / Studies / Reports
    • Conferences
    • Surveys
  • Pavement Special Provisions
  • Legislative
  • Events
  • Site Map
← Best Practices for Achieving and Measuring Pavement Smoothness: A Synthesis of State-of-Practice
Performance-Based Quality Assurance/Quality Control (QA/QC) Acceptance Procedures for In-Place Soil Testing, Phase 3 →

Ground Tire Rubber (GTR) as a Component Material in Concrete Mixtures for Paving Concrete, Phase 2

2015-04-15

The Florida Department of Transportation has released a report that investigates if the problems of expansion and contraction in roadway concrete pavements can be addressed by replacing some of the fine or coarse aggregate component with ground tire rubber.

Read the Report

This entry was posted in General News, New Technology, News, Pavement Design/Const., Pavement Pres. Apps., Studies / Reports, Treatments. Bookmark the permalink.
← Best Practices for Achieving and Measuring Pavement Smoothness: A Synthesis of State-of-Practice
Performance-Based Quality Assurance/Quality Control (QA/QC) Acceptance Procedures for In-Place Soil Testing, Phase 3 →

Comments are closed.

  • TSP2 Homepage
  • TSP2 Pavement Search


  • Pavement Checklists

    Preservation Checklists


    Android
    iOS

  • Partnership Meetings

    2021 NPPC May 17-20
    2021 RMWPPP May 17-20
    2021 MPPP May 17-20
    2021 SEPPP May 17-20
    2021 NEPPP May 17-20

  • Travel Request Forms

    MPPP NEPPP SEPPP RMWPPP
  • Pavement News
  • NCPP Homepage
  • Research Roadmap
  • Contact Us

    Email:  ncpp@egr.msu.edu
    Phone:  (517) 432-8220
    Fax:  (517) 432-8223
  • Address

    2857 Jolly Road
    Okemos, MI 48864
    Map
  • Hours of Operation

    8 am - 5 pm
    Eastern Time
© 2021 - TSP2 Pavement Preservation