Fatigue Risk Management Guide for Rapid Renewal Highway Construction Projects

TRB’s second Strategic Highway Research Program (SHRP 2) Reliability Project R03 has released a prepublication, non-edited version of a report titled Fatigue Risk Management Guide for Rapid Renewal Highway Construction Projects designed to help in the development and implementation of fatigue risk management in rapid renewal highway construction environments.

The guide includes organizational practices guidance, technical reference materials, fatigue training materials, and work scheduling aids and guidance. This suite of products may be integrated into existing safety management systems for highway construction environments, thereby reducing fatigue risk and increasing safety.

SHRP 2 Reliability Project R03 also produced a report titled Identifying and Reducing Worker, Inspector, and Manager Fatigue in Rapid Renewal Environments that documents worker fatigue impacts during rapid renewal operations in the highway construction industry and describes development of the Fatigue Risk Management Guide for Rapid Renewal Highway Construction Projects.

Read the Pre-publication

This entry was posted in Bridge Design/Const., Bridge Pres. Apps., General News, New Technology, News, Pavement Design/Const., Pavement Pres. Apps., Studies / Reports, Treatments. Bookmark the permalink.

Comments are closed.