Chip Seal

State wdt_ID Treatment Service Life Pavement Life Extension Lane Miles Completed (2016) Cost Per Square Yard (2016) Cost Per Lane Mile (2016) Total Project Cost Per Lane Mile Total Quantity Completed by Agency in 2016 (Tons/SY) Treatment Placed by Agency or Contract Specific Treatment Details (gradation, binder type, # of courses, etc.) Pavement Conditions Treated
Wisconsin 6 458 1.38 10,388 11,178 3,438,200 Agency See maintenance special provisions
Minnesota 7 84.982 1.59 11,193 18,014 Contract
Illinois 8 4-6 2 128.8 1.39 9,799.68 12,473.53 826,174.4 Contract Single Lift
North Dakota 9 7-10 1,261 35,000 Contract
Iowa 10 5 3 35 7,300 14,100 247,000 Contract CRS-2P emulsion, 3/8" limestone aggregate Oxidized & aged pavement on low volume roads
Kansas 11 254 14,610 2,358,300 Contract 3/8"x1/4" lightweight aggregate chip seal with CRS-1HP
South Dakota 12 6 4 430 16,000 22,000 Contract See Sections 360 & 882 of the SDDOT Standard Specifications All asphalt concrete surfaces
Michigan 13 3-7 3-7 Single: $1.75 Double: $3.20 Single: $41.95 Double: $50.11 Contract Binder: CSEA
Indiana 14 4-7 4-7 1,479.4 9,080 Agency Aggregate: SC 11 and SC 16 crushed; Emulsion: AE-90S, CRS-2P
Nevada 15 7-8 10,651.36 0.35 1,574.38 Agency 1/2" chip; 1/2' chip w/fog seal; 1/2" chip with 3/8" chip