Chip Seal

Statewdt_IDTreatment Service LifePavement Life ExtensionLane Miles Completed (2016)Cost Per Square Yard (2016)Cost Per Lane Mile (2016)Total Project Cost Per Lane MileTotal Quantity Completed by Agency in 2016 (Tons/SY)Treatment Placed by Agency or ContractSpecific Treatment Details (gradation, binder type, # of courses, etc.)Pavement Conditions Treated
Wisconsin 6 458 1.38 10,388 11,178 3,438,200 Agency See maintenance special provisions
Minnesota 7 84.982 1.59 11,193 18,014 Contract
Illinois 8 4-6 2 128.8 1.39 9,799.68 12,473.53 826,174.4 Contract Single Lift
North Dakota 9 7-10 1,261 35,000 Contract
Iowa 10 5 3 35 7,300 14,100 247,000 Contract CRS-2P emulsion, 3/8" limestone aggregate Oxidized & aged pavement on low volume roads
Kansas 11 254 14,610 2,358,300 Contract 3/8"x1/4" lightweight aggregate chip seal with CRS-1HP
South Dakota 12 6 4 430 16,000 22,000 Contract See Sections 360 & 882 of the SDDOT Standard Specifications All asphalt concrete surfaces
Michigan 13 3-7 3-7 Single: $1.75 Double: $3.20 Single: $41.95 Double: $50.11 Contract Binder: CSEA
Indiana 14 4-7 4-7 1,479.4 9,080 Agency Aggregate: SC 11 and SC 16 crushed; Emulsion: AE-90S, CRS-2P
Nevada 15 7-8 10,651.36 0.35 1,574.38 Agency 1/2" chip; 1/2' chip w/fog seal; 1/2" chip with 3/8" chip