Skip to content
  • Home Page
  • Research
    • Research Roadmap
    • TRB Committee (AKT20)
  • Library
    • Video Library
  • Technical
    • Task Force Products
    • Treatment Quantity & Cost Database
    • Web-Based Training
    • Pavement Preservation Checklist Series 2019
    • Asphalt
    • Concrete
    • Policy
    • Publications / Studies / Reports
  • Pavement Special Provisions
  • Legislative
  • Site Map
← Quality Control/Quality Assurance Testing for Joint Density and Segregation of Asphalt Mixtures
Review of Definition of Modified Granular Materials and Bound Materials →

Worker Safety in Very Short Duration Work Zone Operations: State of Practice and Risk Management Process

2013-05-29

The Center for Transportation Research at the University of Texas-Austin has released a report that explores highway maintenance operations that occur within 15 minutes or less, and examines risk factors that maintenance workers may face while carrying out these operations.

Read the Report

This entry was posted in Data/Statistics, General News, Legislative / Political, New Technology, News, Pavement Design/Const., Pavement Pres. Apps., Studies / Reports, Treatments. Bookmark the permalink.
← Quality Control/Quality Assurance Testing for Joint Density and Segregation of Asphalt Mixtures
Review of Definition of Modified Granular Materials and Bound Materials →

Comments are closed.

  • TSP2 Homepage
  • TSP2 Pavement Search

  • Pavement Checklists

    Preservation Checklists


    Android
    iOS

  • Partnership Meetings

    2024 SEPPP March 19-21 Hot Springs, AR

    2024 NEPPP May 21-2 Albany, NY

    2024 MPPP September 22-24 Deadwood, SD

    2024 RMWPPP November 12-24 Sacramento, CA

  • NCPP Homepage

  • Travel Request Forms

    MPPP NEPPP SEPPP RMWPPP
  • NCPP Homepage
  • Contact Us

    Email:  ncpp@egr.msu.edu
    Phone:  (517) 432-8220
  • Address

    2857 Jolly Road
    Okemos, MI 48864
    Map
  • Hours of Operation

    8 am - 5 pm
    Eastern Time
© 2025 - TSP2 Pavement Preservation